Secure Lifecycle Management

Introduction to Acceptance

Software Qualification (Acceptance) Testing

  • customer determines if software meets acceptance criteria
  • assess contract, standard, and legal reqs under both normal and abnormal conditions
  • cumulative failure profile
    • plot cumulative failures vs suitable time base
    • most appropriately applied during acceptance phase
    • negative slope indicates increasing reliability

Qualification Testing Plan

  • scope, approach, resources, schedule
  • design and execution of tests is normally defined in the contract
  • goal: smallest # of test cases to sufficiently affirm quality and security of product

Testing plan components

  1. required features to test
  2. requisite load limits
  3. number/types of stress tests
  4. risk mitigation and security tests
  5. required performance levels
  6. interfaces to be tested
  7. test cases to address
    1. who generates test designs/cases/procedures?
    2. who executes the tests?
    3. who builds/maintains test bed?
    4. who manages config?
    5. what are criteria for stopping testing?
    6. what are criteria for restarting testing?
    7. when will code be under change control/freeze?
    8. which tests will be under config mgmt?
    9. what level will anomaly reports be written for?

Qualification Testing Hierarchy

  • activities at acceptance level:
    • design traceability anlsys
    • design evaluation
    • design interface anlsys
    • test plan generation
    • test design generation
  • evaluate documentation of each unit

Pre-release Activities

  • total product assurance is not necessarily achievable due to complex and dynamic nature of software

Implementing Pre-release testing process

  • software test plan describes objectives, scope, approach, and focus
  • helps people outside testing group understand why and how
  • detailed enough to be useful but not so much that those outside group cannot understand

Completion Criteria

  • progress milestones are used as evidence of readiness for delivery
  • tangible outcome or action
  • criteria can be decomposed into metrics
  • ISO 9126
    • functionality
    • reliability
    • usability
    • efficiency
    • maintainability
    • portability

Risk Acceptance

  • properties to consider to stay secure within acceptable limits:
    • implicit/explicit safety reqs
    • implicit/explicit security reqs
    • degree of complexity
    • performance factors
    • reliability factors

Evaluation process should answer two questions

  1. what is level of certainty of risk (likelihood)?
  2. what is anticipated impact (loss)?
  • risk assessment requires detailed knowledge of risks and consequences of software. Included in threat model which is created as part of SDLC
  • threat picture/situational assessment: targeted risk assessments that only apply to known vulns at a specific time

Post-release Activities

  • typically not done by dev team
  • best described as config mgmt
  • first, perform complete audit of installed config

Validation and Verification

  • also apply to all stages of software lifecycle
  • activities are documented in the software validation and verification plan (SVVP)
  • validation: are we building the correct product? (i.e. meets user reqs)
  • verification are we building the product correctly? (i.e. proper software construction)
  • the SVVP should specify administrative reqs for:
    • anomaly resolution and reporting
    • exception/deviation policy
    • baseline and config control procs
    • standards practices and conventions adopted for guidance
    • form of relevant docs, including plans, procs, cases, and results

Management V&V

  • examine plans, schedules, reqs, methods for assessing suitability
  • supports decisions about corrective actions, allocation of resources, and project scoping
  • support mgmt personnel who are responsible for system
  • discover and report variations from plans/procs
  • may involve the following mgmt roles:
    • decision maker
    • review leader
    • review recorder
    • mgmt staff
    • tech staff
    • customer/user rep

Technical V&V

  • eval product, reqs/design docs, code/test/user docs/manuals/release notes, build/install procs
  • does product conform to specs? adhere to regs, standards, and plans? correctly implemented/changed?
  • support customer's/supplier's technical/mgmt personnel
  • discover/report defects and anomalies
  • may involve following mgmt roles:
    • decision maker
    • review leader
    • review recorder
    • tech staff/tech managers
    • customer/user tech staff
  • should be scheduled as part of initial project planning
  • ad hoc reviews may also be scheduled

Independent Testing

  • carried out by disinterested third party so customer and supplier trust integrity
  • often called IV&V (audit)
  • ensure customer/supplier have no influence over findings of testers
  • items that may be audited:
    • plans
    • contracts
    • complaints
    • procs
    • reports/docs
    • source code
    • deliverables
  • conducted by single person (lead auditor)
  • audit usually not initiated by producer
  • closing meeting report includes:
    • prelim conclusions
    • problems
    • recommendations for remediation
  • once closing report is accepted, final report itemizes:
    • purpose and scope
    • name of audited org
    • software audited
    • applicable regs/standards
    • audit eval criteria
    • observation list classifying anomalies as major/minor
    • timing of audit follow-up activities